Tuesday, September 4, 2007

The fruits of our labor

Labor Day weekend - we are all home, no school or work so we plan on setting up our corral.
Dimensions: 196 ft x 152 ft made with 20 ft pipe panels welded onto the pipe posts. We got started Sat about 8 am to take advantage of the weather. However, it was a bit discerning to hear gunshots a few miles away - I had forgotten about dove season, September 1 as did the dogs until they hear the shots. It seemed so close!





We are using these gates on each end of the corral - Jerry and Wayne are cutting the bolts and will rehang the gate.










Then we went onto attaching the 20ft panels - Jerry welded
all of the Starling Road side - 196 ft on Saturday!

(The sky really isn't pink!! I moved
the scenery choice button somehow
and got some pink in my pictures!!)






Sunday we planned on hanging two gates on the the south side (152 ft), and driving in the posts. Jerry and I bowl on Sunday and we didn't want to expend all our energy on the fence and not bowl decently. So Monday, Labor Day 2007 all we had left to do was to hang the pipe panels - we would have two sides done, and have something visual to show off with...... Jerry and Wayne carrying a panel This is the short side looking @the road. That's Starling Road going north.

No comments: